Major Works

Hibernian Hotel   Renovation of hotel including demolition and reconstruction of structural and non-structural wall (brickwork and concrete)

Installation of fixture and fittings including toilets, doors, windows and glazing, lighting and ventilation. Finishes included tiling, painting, timber paneling, wallpapering carpeting, vinyl flooring
     
Tunnel Works Centrepoint   Remedial works to two shopping arcadetunnels under main roads within the city. Extensive concrete repairs and waterproofing.

Demolition and reconstruction of tunnel roof. Installation and/or rerouting of various services including, water and electrical and communications.
     
Sydney University Services Building   Make safe and demolition of existing services as required.

Installaiton of various metalwork components including balustrading Installation and commissioning of air conditioning system.
   
Sydney University Biology Building   Demolition of the existing building and removal of waste in an environmentally acceptable way.

Excavation including dewatering, shoring, propping, profiling, filling and compacting of excavated area with approved fill.

Construction of concrete and brickwork walls and composite flooring to vatious levels of the new building. Installation of structural steel columns and beams including a Bondek slab including all temporary works. Concreting of Bondek slab.
     
Wembley House   Strengthening of tunnel roof structure including installation of a composite strengthening system including concrete panels and structural beams. Application of fire protection to new structure.

All access staging and scaffolding and temporary works as required.