| Hibernian Hotel |
|
Renovation
of hotel including demolition and reconstruction of structural and
non-structural wall (brickwork and concrete)
Installation of fixture and fittings including toilets, doors, windows
and glazing, lighting and ventilation. Finishes included tiling, painting,
timber paneling, wallpapering carpeting, vinyl flooring |
| |
|
|
| Tunnel Works Centrepoint |
|
Remedial
works to two shopping arcadetunnels under main roads within the city.
Extensive concrete repairs and waterproofing.
Demolition and reconstruction of tunnel roof. Installation and/or
rerouting of various services including, water and electrical and
communications. |
| |
|
|
| Sydney University Services Building |
|
Make
safe and demolition of existing services as required.
Installaiton of various metalwork components including balustrading
Installation and commissioning of air conditioning system. |
|
|
|
| Sydney University Biology Building |
|
Demolition
of the existing building and removal of waste in an environmentally
acceptable way.
Excavation including dewatering, shoring, propping, profiling, filling
and compacting of excavated area with approved fill.
Construction of concrete and brickwork walls and composite flooring
to vatious levels of the new building. Installation of structural
steel columns and beams including a Bondek slab including all temporary
works. Concreting of Bondek slab. |
| |
|
|
| Wembley House |
|
Strengthening
of tunnel roof structure including installation of a composite strengthening
system including concrete panels and structural beams. Application
of fire protection to new structure.
All access staging and scaffolding and temporary works as required. |